TD Five Boro Bike Tour over the Verrazzano-Narrows Bridge
You can ride across the Verrazzano-Narrows Bridge on Sunday, May 2, 2027 — as a registered rider in the TD Five Boro Bike Tour, the one day a year a bicycle is allowed on the deck. Entry is USD 187.12 including fees. The bridge does not shut completely while the field goes over: on the 2026 pattern the Staten Island-bound lower level closed to cars from 12:01 a.m. to 7:00 p.m., and the upper level stayed open in both directions all day. The 2027 window is not published yet.
Can you ride across the Verrazzano on the Tour?
Yes, and it is the only ride that does it. The Tour is a 40-mile car-free route across all five boroughs, and the Narrows crossing is the section that makes it unique: Bike New York lists “MTA fees for the Verrazzano Bridge” among the costs your entry fee covers, and the VIP package includes a “timed climb over the Verrazzano-Narrows Bridge”. Outside the event there is no access at all — the bridge has no walkway and the operator bars bicycles from the span, which is set out in the rules on walking or cycling the bridge.
It is not a public open-bridge day. Entry is limited to registered riders, the deck is closed to everyone else while the field crosses, and the finish on Staten Island is for riders. If you want the crossing, you enter the event.
When it is: Sunday, May 2, 2027
Bike New York has the 2027 date on its Tour page — SUNDAY, MAY 2, 2027 — and registration for it is open now. Bike New York has moved Tour registration to the haku platform, so your entry, your start wave and your membership all sit in one account.
Two things about planning around that date. Start times for 2027 are not out yet: the organiser says start-location detail will follow in the coming weeks, so do not book a train around a wave time. The maps and the printed programme on the Tour page are still the 2026 edition, and the organiser states that all maps are subject to change. Both dates that change this bridge in 2027 sit on the Verrazano-Narrows Bridge events calendar 2027 alongside the rest of the year.
What closes while it happens
The bridge closes in part, not in full. The operator's record for the 2026 running, on Sunday, May 3, 2026: the Staten Island-bound lower level was closed to vehicle traffic from 12:01 a.m. until 7:00 p.m., while the upper level remained open in both directions throughout the event. The same release put the Bay Street and Lily Pond Avenue exits on Staten Island out from 7:00 a.m. to 7:00 p.m. MTA Bridges and Tunnels runs a tour-closure hotline for the crossing on 718-556-8010.
Our own two published records say the same thing. The closures page gives the date and, for the 2026 Tour, the window 12:01 a.m. to 7:00 p.m. on the Staten Island-bound lower level, and states that the 2027 window has not been published; the 2027 calendar entry describes that same level closed to vehicles all day with the upper level open both ways, and prints no clock time for 2027. Neither carries a 2027 hour, because the operator has not published one. When it does, the full list of scheduled bridge closures carries it.
Bike New York's own Tour page does not state which deck the ride uses, or the hours the bridge closes — those are the bridge operator's announcements, and the 2027 ones are not out yet. If you are driving on May 2, plan on the 2026 pattern and confirm the week of the event.
Registration and what it costs
Three categories, all adult and youth, all with processing fees already in the figure:
| Category | Price, fees included | Tax-deductible donation to Bike New York | What the category adds |
|---|---|---|---|
| Standard (adult and youth) | USD 187.12 | USD 36 | Standard Wave 2 or later |
| Bike New York member (adult and youth) | USD 187.12 | USD 36 | The same price, with guaranteed placement in Standard Wave 1 |
| VIP (adult and youth) | USD 496.70 | USD 96 | VIP Wave 1, a timed climb over the bridge, the VIP jersey and bag, breakfast at the start and lunch at the finish |
Membership does not cut the entry price — a member pays the same USD 187.12 as everyone else. What it buys is Wave 1 and the rest of the membership benefits.
Every category includes the rider packet (helmet cover, bib and bike plate, which is your entry to the ride), snacks and entertainment at the rest areas, a fully supported route with water stops, free repair labour along the way with parts extra, SAG vehicles, entry to the Finish Festival on Staten Island and a finisher medal. The fee also covers the MTA fees for the bridge and the National Park Service fees for the finish.
The event runs rain or shine. In severe or hazardous weather Bike New York notifies registered riders of the contingency plan by text or email. Registration fees are non-deferrable, and they are refundable only if you bought the protection plan when you registered.
Getting to the start
Bike New York points riders at Bowling Green in lower Manhattan for the start, and its own advice is to ride there: the Hudson River Greenway and Broadway both lead straight to it.
From Staten Island the morning works the other way round: park or stay on the island, take the ferry to lower Manhattan, and ride to the start. The Staten Island Ferry carries bikes with no limit on Tour day, and its timetable is stretched for the event:
| Time | Staten Island Ferry on Tour day |
|---|---|
| From 6:00 a.m. | Every 30 minutes until 11:00 a.m. |
| 11:00 a.m. to 6:00 p.m. | Every 15 minutes |
| After 6:00 p.m. | Every 30 minutes |
The Manhattan-bound line gets long from early afternoon, so the organiser's advice is to finish the ride, collect your car on Staten Island and skip the queue. If you drive in instead, park on Staten Island in the morning: cars left along the route are towed and impounded.
On the subway, the MTA asks riders not to bring bikes on the L, M and G trains, and some stations cannot take a bike through the turnstiles at all. From New Jersey the PATH train takes bikes everywhere but the first car, and you will carry the bike up stairs at street level; system detail is at panynj.gov or on 1-800-234-PATH. NYC Ferry is the one option the organiser asks you to skip on Tour day, because its boats cannot take bikes in volume.
Rules on the day
Bikes. Any human-powered pedalled bike is welcome — road, mountain, fixed gear, recumbent, tandem, tricycle, unicycle, pedal-assist e-bikes. Throttle-powered e-bikes are barred from every Bike New York event, even with the throttle switched off.
Bags. No bag with shoulder straps, so no backpacks, hydration packs, drawstring bags or messenger bags; no panniers or anything hanging on the side of the bike; no covered baskets; and nothing over 420 cubic inches (6.9 litres). A confiscated bag is not returned.
Waves. Teams are optional and are the way to start with the people you came with — standard riders are placed in Wave 2 or later, so a team is what keeps a group together. Members and VIPs are already in Wave 1, and teams are switched off for those categories.
Kit. Apparel bought at registration ships in mid-April 2027 to US addresses for members, charity riders and standard riders, and for VIPs who bought rider-packet shipping; a VIP who did not buy it collects the jersey at Packet Pickup. International riders collect their rider packet and anything they bought at Packet Pickup, whose date and place are still to be announced.
If you are driving that Sunday
The crossing stayed open in both directions on the upper level in 2026, so the trip is a normal one for most cars — what changes is the approach. Today's traffic reading for the span is the quickest check before you leave, and which ramp puts you on which deck decides your side of the bridge. A car pays what a Verrazzano crossing costs in each direction, bike tour or not: split tolling has been charged both ways since December 2020.
Questions riders ask
Is the Verrazzano-Narrows Bridge closed to cars on May 2, 2027?
Partly, on the 2026 pattern: the Staten Island-bound lower level shut to vehicles from 12:01 a.m. until 7:00 p.m. while the upper level stayed open in both directions all day. The operator has not published the 2027 window, so treat that as the pattern to plan around rather than a promise.
Can I ride across without registering?
No. Bicycles are barred from the bridge outside the Tour, the deck is closed to everyone but the field while it crosses, and the finish is for registered riders. The ride is an entry, not an open day.
Can I watch the field from the bridge?
There is nowhere to stand. The bridge has no walkway, and the deck is closed to everyone but riders. Fort Wadsworth, where the Finish Festival sits on Staten Island, is closed to the public on Tour day, so the finish is not a spectator gate either.
How far is the ride, and where does it finish?
40 miles, car-free, starting in Manhattan and finishing at the Finish Festival on Staten Island. The bridge is the arrival crossing into Staten Island, not the start of the route.
Do I have to be a Bike New York member?
No, and it saves nothing: the member entry is USD 187.12, the same as standard. Membership buys guaranteed Wave 1 and is worth it only if the early start matters to you.
The organiser's Tour page is the booking route and the place to ask questions: TD Five Boro Bike Tour, Bike New York, or [email protected].
