When has the Verrazzano-Narrows Bridge closed for the NYC Marathon, year by year?

At every edition since 2023 the bridge has closed on the same clock: upper level from 11:00 p.m. on the Saturday, everything from 7:00 a.m., the Staten Island exits from 3:00 a.m., and a reopening at about 4:00 p.m. What moves is the date, which follows the first Sunday in November.

The marathon closure, edition by edition. Each row is the operator's own race-day notice.
EditionRace dayUpper level closesBridge closed to trafficBay Street and Lily Pond exits closeReopensNotice dated
2023Sun 5 November 2023Sat 4 November, 11:00 p.m.7:00 a.m. – 4:00 p.m.3:00 a.m.About 4:00 p.m.1 November 2023
2024Sun 3 November 2024Sat 2 November, 11:00 p.m.7:00 a.m. – 4:00 p.m.3:00 a.m.About 4:00 p.m.29 October 2024
2025Sun 2 November 2025Sat 1 November, 11:00 p.m.7:00 a.m. – 4:00 p.m.3:00 a.m.About 4:00 p.m.28 October 2025
2026Sun 1 November 2026Sat 31 October, 11:00 p.m.7:00 a.m. – 4:00 p.m.3:00 a.m.About 4:00 p.m.28 October 2026
2027Sun 7 November 2027Not yet published. The operator's notices for the four editions above were issued in the last week of October.

The pattern since 2023

Four editions, one timetable. The upper level has gone at 11:00 p.m. on the Saturday night every time, the full closure has run 7:00 a.m. to 4:00 p.m., and the two Staten Island exits have shut at 3:00 a.m. and reopened with the bridge in the afternoon. The notice itself lands about ten days before the race: 1 November 2023, 29 October 2024, 28 October 2025, 28 October 2026.

The date moves with the calendar rather than a fixed day of the month: 5 November in 2023, 3 November in 2024, 2 November in 2025, 1 November in 2026, and 7 November in 2027, each of them the first Sunday in November.

The field at the 2026 edition

The 2026 race was the first marathon to record more than 60,000 finishers: 61,146 finishers from a field of 61,529 starters.

Next year's closure

The 2027 race is on Sunday 7 November 2027. The clock for it will be published in the last week of October 2027; until then, the current timetable is on the marathon-day closure timetable, and the 2027 date sits alongside the rest of the year's events on the events calendar for 2027. Closures from other causes are on bridge status and closures.

Each row above is the operator's own race-day notice for that edition, under the date in the last column.

Bridge History

From its completion in 1964 until 1981 the Verrazano-Narrows Bridge was the longest suspension bridge in the world. But the idea for the bridge went back a lot before 1964, in fact some of the first serious proposals are from the 1950s when Port Authority of New York and the Triborough Bridge and Tunnel Authority held a joint study on improving traffic flows in the area.


Β© Copyright 2026, verrazano-narrows-bridge.com, All Rights Reserved.