What happens on the Verrazzano-Narrows Bridge on NYC Marathon Sunday?
The marathon starts at Fort Wadsworth on Staten Island and crosses the Verrazzano-Narrows in its first two miles. From early morning until late afternoon the bridge carries runners and nothing else, and for nine hours there is no direct road link at all between Staten Island and Brooklyn. The closure runs about nine hours, the start line sits at Fort Wadsworth, and the crossings that stay open are the Goethals, the Outerbridge and the Staten Island Ferry.
Race day: Sunday 7 November 2027
The next TCS New York City Marathon is on Sunday 7 November 2027. On race day the bridge closes to all non-emergency traffic from 7:00 a.m. and reopens at about 4:00 p.m.; the upper level closes in both directions from 11:00 p.m. the night before. MTA Bridges and Tunnels publishes the clock for each edition in the last week of October — the notices for 2024, 2025 and 2026 were dated 29 October 2024, 28 October 2025 and 28 October 2026.
The six questions this section answers
| If you need to know… | Go to |
|---|---|
| When exactly the bridge shuts, level by level, and when it reopens | The marathon-day closure timetable |
| How runners reach Fort Wadsworth, and what happens if they miss their transport | Getting to the start line |
| Where you can stand to watch the race, and when the field passes | Spectator spots in Brooklyn |
| How to cross while the bridge is shut, and what each crossing costs | Getting around on marathon morning |
| Whether you can walk or ride a bike over the bridge | Walking and cycling on race day |
| What the closure looked like at earlier editions | The closure, year by year |
The closure at a glance
| When | What closes |
|---|---|
| Sat 31 October, 11:00 p.m. | Upper level, both directions, for roadway preparation. Over-dimensional vehicles and hazardous materials are barred from the bridge in both directions from this point. |
| Sun 1 November, 3:00 a.m. | Bay Street and Lily Pond Avenue exits on Staten Island. |
| Sun 1 November, 7:00 a.m. | Both levels, both directions: closed to all non-emergency vehicular traffic. |
| Sun 1 November, about 4:00 p.m. | Bridge reopens to traffic, and the two Staten Island exits reopen at about the same time. |
Between 11:00 p.m. on the Saturday and 7:00 a.m. on the Sunday the lower level still carries traffic. Once the full closure begins, nothing crosses by road.
Who is on the bridge that morning
Registered runners wearing an official race bib, and emergency vehicles. Not spectators, not pedestrians, not cyclists, and not runners without a bib. There is no spectator viewing at the start or on the Verrazzano-Narrows, and the organiser does not allow spectators on any of the bridges on the course.
The start lines sit at the Staten Island end of the span, and the runners wait at Fort Wadsworth rather than on the deck. Start times at the 2026 edition ran from 8:00 a.m. for the professional wheelchair field to 11:30 a.m. for the last of the five mass waves, with 61,529 runners starting.
| Start | Field |
|---|---|
| 8:00 a.m. | Men's professional wheelchair |
| 8:02 a.m. | Women's professional wheelchair |
| 8:22 a.m. | Handcycles and select athletes with disabilities |
| 8:35 a.m. | Professional women |
| 9:05 a.m. | Professional men |
| 9:10 a.m. | Wave 1 |
| 9:45 a.m. | Wave 2 |
| 10:20 a.m. | Wave 3 |
| 10:55 a.m. | Wave 4 |
| 11:30 a.m. | Wave 5 |
Crossing while the bridge is shut
By road, every Staten Island–Brooklyn trip goes around through New Jersey: the Goethals Bridge at the north end of the island or the Outerbridge Crossing at the south, then north on the New Jersey Turnpike or I-95 to a Hudson crossing. From Brooklyn the Hugh L. Carey Tunnel puts you into Lower Manhattan, but it does not reach Staten Island. On foot or by bike, the Staten Island Ferry is free and runs all day. The toll table, the ferry timetable and the bus picture are on getting around on marathon morning.
If you are driving on race day
The bridge reopens at about 4:00 p.m., in coordination with the NYPD. MTA runs a recorded line for the closure on (718) 692-5656; live conditions are on the MTA Bridges and Tunnels board or by calling 511. What is closed on other days is on the bridge status and closures page, and the rates that apply once the bridge reopens are on the toll page.
