Live Bridge Status Loading... -- Fetching traffic data... -- Full Traffic Details β†’

What happens on the Verrazzano-Narrows Bridge on NYC Marathon Sunday?

The marathon starts at Fort Wadsworth on Staten Island and crosses the Verrazzano-Narrows in its first two miles. From early morning until late afternoon the bridge carries runners and nothing else, and for nine hours there is no direct road link at all between Staten Island and Brooklyn. The closure runs about nine hours, the start line sits at Fort Wadsworth, and the crossings that stay open are the Goethals, the Outerbridge and the Staten Island Ferry.

Race day: Sunday 7 November 2027

The next TCS New York City Marathon is on Sunday 7 November 2027. On race day the bridge closes to all non-emergency traffic from 7:00 a.m. and reopens at about 4:00 p.m.; the upper level closes in both directions from 11:00 p.m. the night before. MTA Bridges and Tunnels publishes the clock for each edition in the last week of October — the notices for 2024, 2025 and 2026 were dated 29 October 2024, 28 October 2025 and 28 October 2026.

The six questions this section answers

Marathon-day pages on this site
If you need to know…Go to
When exactly the bridge shuts, level by level, and when it reopensThe marathon-day closure timetable
How runners reach Fort Wadsworth, and what happens if they miss their transportGetting to the start line
Where you can stand to watch the race, and when the field passesSpectator spots in Brooklyn
How to cross while the bridge is shut, and what each crossing costsGetting around on marathon morning
Whether you can walk or ride a bike over the bridgeWalking and cycling on race day
What the closure looked like at earlier editionsThe closure, year by year

The closure at a glance

Race-day clock at the 2026 edition, published by MTA Bridges and Tunnels on 28 October 2026
WhenWhat closes
Sat 31 October, 11:00 p.m.Upper level, both directions, for roadway preparation. Over-dimensional vehicles and hazardous materials are barred from the bridge in both directions from this point.
Sun 1 November, 3:00 a.m.Bay Street and Lily Pond Avenue exits on Staten Island.
Sun 1 November, 7:00 a.m.Both levels, both directions: closed to all non-emergency vehicular traffic.
Sun 1 November, about 4:00 p.m.Bridge reopens to traffic, and the two Staten Island exits reopen at about the same time.

Between 11:00 p.m. on the Saturday and 7:00 a.m. on the Sunday the lower level still carries traffic. Once the full closure begins, nothing crosses by road.

Who is on the bridge that morning

Registered runners wearing an official race bib, and emergency vehicles. Not spectators, not pedestrians, not cyclists, and not runners without a bib. There is no spectator viewing at the start or on the Verrazzano-Narrows, and the organiser does not allow spectators on any of the bridges on the course.

The start lines sit at the Staten Island end of the span, and the runners wait at Fort Wadsworth rather than on the deck. Start times at the 2026 edition ran from 8:00 a.m. for the professional wheelchair field to 11:30 a.m. for the last of the five mass waves, with 61,529 runners starting.

Start times at the 2026 edition (New York Road Runners)
StartField
8:00 a.m.Men's professional wheelchair
8:02 a.m.Women's professional wheelchair
8:22 a.m.Handcycles and select athletes with disabilities
8:35 a.m.Professional women
9:05 a.m.Professional men
9:10 a.m.Wave 1
9:45 a.m.Wave 2
10:20 a.m.Wave 3
10:55 a.m.Wave 4
11:30 a.m.Wave 5

Crossing while the bridge is shut

By road, every Staten Island–Brooklyn trip goes around through New Jersey: the Goethals Bridge at the north end of the island or the Outerbridge Crossing at the south, then north on the New Jersey Turnpike or I-95 to a Hudson crossing. From Brooklyn the Hugh L. Carey Tunnel puts you into Lower Manhattan, but it does not reach Staten Island. On foot or by bike, the Staten Island Ferry is free and runs all day. The toll table, the ferry timetable and the bus picture are on getting around on marathon morning.

If you are driving on race day

The bridge reopens at about 4:00 p.m., in coordination with the NYPD. MTA runs a recorded line for the closure on (718) 692-5656; live conditions are on the MTA Bridges and Tunnels board or by calling 511. What is closed on other days is on the bridge status and closures page, and the rates that apply once the bridge reopens are on the toll page.

Bridge History

From its completion in 1964 until 1981 the Verrazano-Narrows Bridge was the longest suspension bridge in the world. But the idea for the bridge went back a lot before 1964, in fact some of the first serious proposals are from the 1950s when Port Authority of New York and the Triborough Bridge and Tunnel Authority held a joint study on improving traffic flows in the area.


Β© Copyright 2026, verrazano-narrows-bridge.com, All Rights Reserved.
Navigation